Project Experience – Hwy 407 Median

Project Name:Hwy 407 Median
Location:407 Between 404 and 400
Client Name:407 ETR
Completion Date:Aug-12
Cost:$9,000,000
Project Description:

The 407 Median project consisted of the completion of the ultimate widening of Highway 407 between Highway 400 and Highway 404. The existing drainage was completed, and the median was filled in and brought to grade so that 2 median shoulders could be added. This allowed the existing shoulder lanes to become two new driven lanes. Once the median shoulders were brought to grade, Concrete Median Walls of various configurations were then constructed and the new shoulders were paved with 2 lifts of Hot Mix the length of the 16 Kilometer project.